Type search words and press enter
TallyPrime now automatically fetches the distance between origin and destination pincodes, and prints it in the e-Way Bill. You no longer have to manually enter this distance. Download TallyPrime Release 5.1 now!
https://help.tallysolutions.com/docs/te9rel64/Advanced_Features/Advanced_Inventory_Features/C_Cjob.htm

Cost Centres for Job Costing

On enabling Job Costing for the company, the option to use cost centres for job costing will be available in the cost centres. You can enable this option either during  creation or alteration of cost centres.

Cost centres enabled for job costing will be available for selection in the Job Work Analysis report.

To enable Job Costing in Cost Centres

1. Go to Gateway of Tally > Accounts Info > Cost Centres > Create .

2. Enter the Name of the cost centre.

3. Select Primary or the required cost centre in the field Under .

4. Set the option Use for Job Costing to Yes .

The Cost Centre Creation screen appears as shown below:

5. Press Enter .

6. Press Enter to save the cost centre.