Type search words and press enter
TallyPrime now automatically fetches the distance between origin and destination pincodes, and prints it in the e-Way Bill. You no longer have to manually enter this distance. Download TallyPrime Release 5.1 now!
https://help.tallysolutions.com/docs/td9rel54/td9/working_with_projects/working_with_projects.htm

Working with Projects

With every release of Tally.Developer 9, the source code of latest Tally.ERP 9 is provided as a Default TDL project . The latest Default TDL is available as tdlserver.dll file. The Default TDL project is loaded based on the tdlserver.dll file available in the Tally.Developer 9 application folder.

The Default TDL project name and release details are displayed in the Project Browser as shown below:

Loading Default TDL Project

Tally.Developer 9 provides a facility to load Default TDL project of any Tally.ERP 9 releases. The default TDLs are loaded and displayed in the project browser, along with the release/version information.

To load a Default TDL project

1. Start Tally.Developer 9 .

2. Go to Tools > Preferences .

3. Click Compiler/Execution Options .

4. Select the required Tally.ERP 9 application in the Tally.ERP 9 Exe Path field.

5. Select the option Load Default / Base TDL Reference from Tally.ERP 9 exe path. The default TDL code for the specified Tally.ERP 9 release is loaded.

Note: To close a Default TDL project, g o to Files > Close Default TDL .